Preliminary Corridor Displays - Preliminary Corridors Evaluated Map
Preliminary Corridor Displays - Western Corridor Map
Preliminary Corridor Displays - Spot Improvement Map
Preliminary Corridor Displays - Limited Spot Improvements Map
Preliminary Corridor Displays - US 41 Corridor Map
Preliminary Corridor Displays - Near East Corridor Map
Preliminary Corridor Displays - Far East Corridor Map
Preliminary Corridor Displays - Evaluation Matrix
The report from the City Council briefing meeting in December is available in PDF format.
The report from the City Council briefing meeting in November is available in PDF format.
http://www.in.gov/indot/
Indiana Department of Transportation
http://www.dot.state.il.us/
Illinois Department of Transportation
http://www.state.in.us/idem/
Indiana Department of Environmental Management
http://www.epa.state.il.us/
Illinois EPA
http://129.79.145.7/arcims/statewide_mxd/index.html
Indiana GIS Atlas
The report from the City Council briefing meeting in October is available in PDF format.
In 1991, a feasibility study was conducted for constructing a grade separation structure on 6th Street at the CSX Rail Transportation (CSXT) crossing between College Avenue and St. Clair Street. Recognizing the increased railway traffic and the time delays for vehicular traffic through this portion of 6th Street, the City requested a feasibility study to investigate the site and develop alternatives to alleviate the traffic delays occurring within the City at that location at that time.
This is the monthly progress report for September 2007.
Miss the Public Open House on September 18, or just want another look at the information presented? The informational display boards are now available for viewing.
The progress report for the month of August is available in PDF format.
The progress report for the month of July is available in PDF format.
The progress report for the month of June is available in PDF format.
The progress report for the month of May is available in PDF format.
The progress report for the month of April is available in PDF format.
This document contains the background information for the Vincennes Railroad Relocation.