Download Project Schedule Last Updated 9/27/07
 

Sections

Email Updates

Enter your email below to receive project updates.

(We will not share your email address with anyone)

Document Library

(February 29, 2008)
(February 29, 2008)

The report from the City Council briefing meeting in December is available in PDF format.

(February 11, 2008)

The report from the City Council briefing meeting in November is available in PDF format.

(December 12, 2007)

http://www.in.gov/indot/
Indiana Department of Transportation

http://www.dot.state.il.us/
Illinois Department of Transportation

http://www.state.in.us/idem/
Indiana Department of Environmental Management

http://www.epa.state.il.us/
Illinois EPA

http://129.79.145.7/arcims/statewide_mxd/index.html
Indiana GIS Atlas

(October 29, 2007)

The report from the City Council briefing meeting in October is available in PDF format.

(October 29, 2007)

In 1991, a feasibility study was conducted for constructing a grade separation structure on 6th Street at the CSX Rail Transportation (CSXT) crossing between College Avenue and St. Clair Street. Recognizing the increased railway traffic and the time delays for vehicular traffic through this portion of 6th Street, the City requested a feasibility study to investigate the site and develop alternatives to alleviate the traffic delays occurring within the City at that location at that time.

(October 22, 2007)

This is the monthly progress report for September 2007.

(October 01, 2007)

Miss the Public Open House on September 18, or just want another look at the information presented? The informational display boards are now available for viewing.

(September 27, 2007)

The progress report for the month of August is available in PDF format.

(August 28, 2007)

The progress report for the month of July is available in PDF format.

(August 02, 2007)

The progress report for the month of June is available in PDF format.

(July 02, 2007)

The progress report for the month of May is available in PDF format.

(July 02, 2007)

The progress report for the month of April is available in PDF format.

(April 30, 2007)

This document contains the background information for the Vincennes Railroad Relocation.

(March 21, 2007)